permit · 26TMP-019317 ·
Commercial Building Permit: BETA SLC
220 N 3700 W, Salt Lake City UT 84116-0000
Development
THE PROJECT CONSISTS OF INSTALLING BETA TECHNOLOGIES ELECTRIC AIRCRAFT CHARGING INFRASTRUCTURE AT SALT LAKE CITY INTERNATIONAL AIRPORT(SLC). IMPROVEMENTS INCLUDE ONE ELECTRIC AIRCRAFT CHARGER, ONE MINI-CUBE PEDESTAL, AND PROVISIONS FOR A FUTURE THERMAL MANAGEMENTSYSTEM (TMS). THE PROJECT WILL INCLUDE INSTALLATION OF ONE ELECTRIC AIRCRAFT CHARGE CUBE ON A CONCRETE PAD, ONE CONCRETE PAD RESERVEDFOR A FUTURE THERMAL MANAGEMENT SYSTEM (TMS), ONE CONCRETE SUPPORT PAD TO HOUSE 800A DISTRIBUTION PANEL, ONE POWER TOWER (POWERINVERTOR), AND PROVISIONAL SPACE FOR FUTURE CHILLER UNIT. ADDITIONALLY, THE PROJECT INCLUDES INSTALLATION OF UNDERGROUND CONDUITS FORPOWER AND COMM, HANDHOLES AND PIPING TO TRANSPORT PROPYLENE GLYCOL FROM FUTURE CHILLER TO THE PROVISIONAL SPACE FOR FUTURE TMS CUBE.THE PROJECT ALSO INCLUDES A CT METERING CABINET AND UTILITY DISCONNECT MOUNTED ON AN H-FRAME STRUCTURE, ALONG WITH THE ASSOCIATEDCONCRETE PAD REQUIRED TO SUPPORT THE UTILITY SERVICE CONNECTION AND ROCKY MOUNTAIN POWER (RMP) REQUIREMENTS. ALL PROPOSEDIMPROVEMENTS SHALL BE INSTALLED IN ACCORDANCE WITH SALT LAKE CITY INTERNATIONAL AIRPORT (SLC) STANDARDS AND REQUIREMENTS. ELECTRICALSERVICE SHALL BE PROVIDED FROM THE EXISTING RMP TRANSFORMER IDENTIFIED AND DESIGNATED FOR THE PROJECT.
Ours To Govern sends a free weekly email about Salt Lake City government activity near the places you care about — with links to the record and a way to be heard before decisions are final.
Timeline
- September 2, 2026Commercial Building Permit: BETA SLCTHE PROJECT CONSISTS OF INSTALLING BETA TECHNOLOGIES ELECTRIC AIRCRAFT CHARGING INFRASTRUCTURE AT SALT LAKE CITY INTERNATIONAL AIRPORT(SLC). IMPROVEMENTS INCLUDE ONE ELECTRIC AIRCRAFT CHARGER, ONE MINI-CUBE PEDESTAL, AND PROVISIONS FOR A FUTURE THERMAL MANAGEMENTSYSTEM (TMS). THE PROJECT WILL INCLUDE INSTALLATION OF ONE ELECTRIC AIRCRAFT CHARGE CUBE ON A CONCRETE PAD, ONE CONCRETE PAD RESERVEDFOR A FUTURE THERMAL MANAGEMENT SYSTEM (TMS), ONE CONCRETE SUPPORT PAD TO HOUSE 800A DISTRIBUTION PANEL, ONE POWER TOWER (POWERINVERTOR), AND PROVISIONAL SPACE FOR FUTURE CHILLER UNIT. ADDITIONALLY, THE PROJECT INCLUDES INSTALLATION OF UNDERGROUND CONDUITS FORPOWER AND COMM, HANDHOLES AND PIPING TO TRANSPORT PROPYLENE GLYCOL FROM FUTURE CHILLER TO THE PROVISIONAL SPACE FOR FUTURE TMS CUBE.THE PROJECT ALSO INCLUDES A CT METERING CABINET AND UTILITY DISCONNECT MOUNTED ON AN H-FRAME STRUCTURE, ALONG WITH THE ASSOCIATEDCONCRETE PAD REQUIRED TO SUPPORT THE UTILITY SERVICE CONNECTION AND ROCKY MOUNTAIN POWER (RMP) REQUIREMENTS. ALL PROPOSEDIMPROVEMENTS SHALL BE INSTALLED IN ACCORDANCE WITH SALT LAKE CITY INTERNATIONAL AIRPORT (SLC) STANDARDS AND REQUIREMENTS. ELECTRICALSERVICE SHALL BE PROVIDED FROM THE EXISTING RMP TRANSFORMER IDENTIFIED AND DESIGNATED FOR THE PROJECT.